Login Form

Q2 Plans Appendix Page i

TABLE OF CONTENTS
CHAPTER
TITLE
NO. OF PAGES
NO. OF SHEETS
 
SECTION I
   
1
DESCRIPTION AND INTRODUCTION  
3
2
2
BILL OF MATERIALS  
1
1
3
COMPOSITE MATERIALS EDUCATION  
23
12
4
INDIVIDUAL PART CONSTRUCTION  
2
1
5
HOT-WIRING  
4
2
6
AILERONS, RUDDER, AND ELEVATORS CONSTRUCTION  
3
2
7
VERTICAL FIN CONSTRUCTION  
2
1
8
BASIC FUSELAGE ASSEMBLY  
5
3
9
MAIN WING CONSTRUCTION  
9
5
10
CANARD CONSTRUCTION  
10
5
11
WHEEL PANT/TIRE/WHEEL/BRAKE ASSEMBLY  
6
3
12
MAIN WING AND CANARD MOUNTING  
3
2
13
CANOPY ASSEMBLY AND MOUNTING  
4
2
14
FUSELAGE DETAIL ASSEMBLY  
10
5
-
APPENDIX SHEETS 1 THRU 6  
6
6
 
SECTION II
   
15
MAKING YOUR Q2 TRAILERABLE  
2
1
16
ENGINE INSTALLATION  
6
3
17
FUEL SYSTEM INSTALLATION  
3
2
18
INSTRUMENT AND PITOT-STATIC SYSTEM INSTALLATION  
1
1
19
ELECTRICAL SYSTEM  
1
1
20
COMPLETING YOUR Q2  
5
3

 

ADDITIONAL Q2 DOCUMENTATION
TITLE
 
CONTENTS
 
DATE OF FIRST PUBLICATION
         
Q2 Pilot's Manual   Flight and maintenance manual includes normal and emergency procedures, weight and balance, check lists, detailed flying qualities descriptions, operating limitations, performance charts, first flight test procedures, pilot checkout procedures, and systems descriptions.   1 May, 1981
Quickie Newsletter   Published quarterly (Jan, April, July, and October); includes plans changes, builder tips, options, current and future developments, and dates and information on future seminars.   25 May, 1978
Q2 Information Package   Provides general information on the Q2, including performance, construction techniques, and a poster.   9 February, 1981
Quickie & 'Q2 Composite Materials Introductory Package   Provides an education in the techniques required in
the building of a Q2. Includes a booklet, and sufficient materials for several suggested projects. Somewhat redundant with Chapter 3 of the Q2 Construction Pl ans .
  8 April, 1981
         
...The QUICKIE Q2 kit, properly constructed, will reproduce the successful original QUICKIE Q2 designed, and tested by QUICKIE AIRCRAFT CORPORATION. QUICKIE AIRCRAFT CORPORATION is not responsible, and makes no warranties, express or implied whatsoever, regarding the structural integrity, performance, flight characteristics, or safety of the Buyer's completed aircraft and its component parts. QUICKIE AIRCRAFT CORPORATION has no control and assumes no control over the Buyer's ability to successfully construct and test the QUICKIE Q2 AIRCRAFT. Buyer expressly waives any and all claims arising from structural integrity, performance, flight characteristics, mechanical failures, and safety against QUICKIE AIRCRAFT CORPORATION. Buyer acknowledges awareness of the risks of flying a homebuilt aircraft. Buyer acknowledges that the FAA must inspect the aircraft at construction intervals, as well as the completed project, prior to flight and should work with his local FAA representative regarding the construction and licensing of the aircraft.
... QUICKIE AIRCRAFT CORPORATION reserves the right to make recommended revisions in the plans and construction of the aircraft at any time without liability to QUICKIE AIRCRAFT CORPORATION, as such revisions or changes may be deemed advisable from time to time.
i