Q1 Plans Chapter 9 Page 9-2
- Details
- Category: Quickie Plans
- Published: Tuesday, 30 September 2008 01:00
- Written by Dan Yager
- Hits: 2786
SHOULDER HARNESS INSTALLATION
Prior to glassing the bottom skin on the main wing, you will have to install two 1” square, 3/16” thick mild steel plates for installing the shoulder harnesses later. The plates should fit flush with the bottom wing foam line.
Following glassing the bottom skin on the main wing, layup ten plies of BID 2” square over each steel plate. Once the layup has cured, drill and tap for a AN4 bolt in each plate. An assembly drawing is included. Remember that the shoulder harness bolts are at BL4.5 on each side.